Week 8 [Fri, Oct 1st] - Topics

Detailed Table of Contents



Guidance for the item(s) below:

As you do projects, you'll have to make design decisions e.g., decide between multiple design alternatives. Let us learn three fundamental design concepts that you can use in those decisions.

It is extremely important for you to know these three because they are like the DNA of every higher-level design concept.

[W8.1] Design: Fundamentals

Video


Abstraction

W8.1a :

Design → Design Fundamentals → Abstraction → What

Can explain abstraction

Abstraction is a technique for dealing with complexity. It works by establishing a level of complexity we are interested in, and suppressing the more complex details below that level.

The guiding principle of abstraction is that only details that are relevant to the current perspective or the task at hand need to be considered. As most programs are written to solve complex problems involving large amounts of intricate details, it is impossible to deal with all these details at the same time. That is where abstraction can help.

Data abstraction: abstracting away the lower level data items and thinking in terms of bigger entities

Within a certain software component, you might deal with a user data type, while ignoring the details contained in the user data item such as name, and date of birth. These details have been ‘abstracted away’ as they do not affect the task of that software component.

Control abstraction: abstracting away details of the actual control flow to focus on tasks at a higher level

print(“Hello”) is an abstraction of the actual output mechanism within the computer.

Abstraction can be applied repeatedly to obtain progressively higher levels of abstraction.

An example of different levels of data abstraction: a File is a data item that is at a higher level than an array and an array is at a higher level than a bit.

An example of different levels of control abstraction: execute(Game) is at a higher level than print(Char) which is at a higher level than an Assembly language instruction MOV.

Abstraction is a general concept that is not limited to just data or control abstractions.

Some more general examples of abstraction:

  • An OOP class is an abstraction over related data and behaviors.
  • An architecture is a higher-level abstraction of the design of a software.
  • Models (e.g., UML models) are abstractions of some aspect of reality.


Coupling

W8.1b :

Design → Design Fundamentals → Coupling → What

Can explain coupling

Coupling is a measure of the degree of dependence between components, classes, methods, etc. Low coupling indicates that a component is less dependent on other components. High coupling (aka tight coupling or strong coupling) is discouraged due to the following disadvantages:

  • Maintenance is harder because a change in one module could cause changes in other modules coupled to it (i.e. a ripple effect).
  • Integration is harder because multiple components coupled with each other have to be integrated at the same time.
  • Testing and reuse of the module is harder due to its dependence on other modules.

In the example below, design A appears to have more coupling between the components than design B.

Exercises



W8.1c :

Design → Design Fundamentals → Coupling → How

Design → Design Fundamentals → Coupling → What


Can reduce coupling

X is coupled to Y if a change to Y can potentially require a change in X.

If the Foo class calls the method Bar#read(), Foo is coupled to Bar because a change to Bar can potentially (but not always) require a change in the Foo class e.g. if the signature of Bar#read() is changed, Foo needs to change as well, but a change to the Bar#write() method may not require a change in the Foo class because Foo does not call Bar#write().

code for the above example


Some examples of coupling: A is coupled to B if,

  • A has access to the internal structure of B (this results in a very high level of coupling)
  • A and B depend on the same global variable
  • A calls B
  • A receives an object of B as a parameter or a return value
  • A inherits from B
  • A and B are required to follow the same data format or communication protocol

Exercises



W8.1d :

Design → Design Fundamentals → Coupling → Types of coupling

Design → Design Fundamentals → Coupling → What


Can identify types of coupling

Some examples of different coupling types:

  • Content coupling: one module modifies or relies on the internal workings of another module e.g., accessing local data of another module
  • Common/Global coupling: two modules share the same global data
  • Control coupling: one module controlling the flow of another, by passing it information on what to do e.g., passing a flag
  • Data coupling: one module sharing data with another module e.g. via passing parameters
  • External coupling: two modules share an externally imposed convention e.g., data formats, communication protocols, device interfaces.
  • Subclass coupling: a class inherits from another class. Note that a child class is coupled to the parent class but not the other way around.
  • Temporal coupling: two actions are bundled together just because they happen to occur at the same time e.g. extracting a contiguous block of code as a method although the code block contains statements unrelated to each other


Cohesion

W8.1e :

Design → Design Fundamentals → Cohesion → What

Can explain cohesion

Cohesion is a measure of how strongly-related and focused the various responsibilities of a component are. A highly-cohesive component keeps related functionalities together while keeping out all other unrelated things.

Higher cohesion is better. Disadvantages of low cohesion (aka weak cohesion):

  • Lowers the understandability of modules as it is difficult to express module functionalities at a higher level.
  • Lowers maintainability because a module can be modified due to unrelated causes (reason: the module contains code unrelated to each other) or many modules may need to be modified to achieve a small change in behavior (reason: because the code related to that change is not localized to a single module).
  • Lowers reusability of modules because they do not represent logical units of functionality.

W8.1f :

Design → Design Fundamentals → Cohesion → How

Design → Design Fundamentals → Cohesion → What


Can increase cohesion

Cohesion can be present in many forms. Some examples:

  • Code related to a single concept is kept together, e.g. the Student component handles everything related to students.
  • Code that is invoked close together in time is kept together, e.g. all code related to initializing the system is kept together.
  • Code that manipulates the same data structure is kept together, e.g. the GameArchive component handles everything related to the storage and retrieval of game sessions.

Suppose a Payroll application contains a class that deals with writing data to the database. If the class includes some code to show an error dialog to the user if the database is unreachable, that class is not cohesive because it seems to be interacting with the user as well as the database.

Exercises




Guidance for the item(s) below:

As you are still in the early stage of the project, this is a good time to learn some design principles that you can try to apply in the internal design of your product.

These principles build on top of the design fundamentals you learned earlier (i.e., abstraction, coupling, cohesion).

[W8.2] Design Principles: SoC, SRP

W8.2a :

Principles → Separation of concerns principle

Video

Can explain separation of concerns principle

Separation of concerns principle (SoC): To achieve better modularity, separate the code into distinct sections, such that each section addresses a separate concern. -- Proposed by Edsger W. Dijkstra

A concern in this context is a set of information that affects the code of a computer program.

Examples for concerns:

  • A specific feature, such as the code related to the add employee feature
  • A specific aspect, such as the code related to persistence or security
  • A specific entity, such as the code related to the Employee entity

Applying Separation of ConcernsSoC reduces functional overlaps among code sections and also limits the ripple effect when changes are introduced to a specific part of the system.

If the code related to persistence is separated from the code related to security, a change to how the data are persisted will not need changes to how the security is implemented.

This principle can be applied at the class level, as well as at higher levels.

The n-tier architecture utilizes this principle. Each layer in the architecture has a well-defined functionality that has no functional overlap with each other.

This principle should lead to higher cohesion and lower coupling.

Exercises



W8.2b :

Principles → Single responsibility principle

Video

Can explain single responsibility principle

Single responsibility principle (SRP): A class should have one, and only one, reason to change. -- Robert C. Martin

If a class has only one responsibility, it needs to change only when there is a change to that responsibility.

Consider a TextUi class that does parsing of the user commands as well as interacting with the user. That class needs to change when the formatting of the UI changes as well as when the syntax of the user command changes. Hence, such a class does not follow the SRP.

Gather together the things that change for the same reasons. Separate those things that change for different reasons. ―- Agile Software Development, Principles, Patterns, and Practices by Robert C. Martin

Resources




Guidance for the item(s) below:

Coordinating a team project is not easy. Given below are some very basic tools and techniques that are often used in planning, scheduling, and tracking projects.

[W8.3] Project Mgt: Scheduling and Tracking

Video

W8.3a :

Project Management → Project Planning → Milestones

Can explain milestones

A milestone is the end of a stage which indicates significant progress. You should take into account dependencies and priorities when deciding on the features to be delivered at a certain milestone.

Each intermediate product release is a milestone.

In some projects, it is not practical to have a very detailed plan for the whole project due to the uncertainty and unavailability of required information. In such cases, you can use a high-level plan for the whole project and a detailed plan for the next few milestones.

Milestones for the Minesweeper project, iteration 1

Day Milestones
Day 1 Architecture skeleton completed
Day 3 ‘new game’ feature implemented
Day 4 ‘new game’ feature tested

W8.3b :

Project Management → Project Planning → Buffers

Can explain buffers

A buffer is time set aside to absorb any unforeseen delays. It is very important to include buffers in a software project schedule because effort/time estimations for software development are notoriously hard. However, do not inflate task estimates to create hidden buffers; have explicit buffers instead. Reason: With explicit buffers, it is easier to detect incorrect effort estimates which can serve as feedback to improve future effort estimates.


W8.3c :

Project Management → Project Planning → Issue trackers

Can explain issue trackers

Keeping track of project tasks (who is doing what, which tasks are ongoing, which tasks are done etc.) is an essential part of project management. In small projects, it may be possible to keep track of tasks using simple tools such as online spreadsheets or general-purpose/light-weight task tracking tools such as Trello. Bigger projects need more sophisticated task tracking tools.

Issue trackers (sometimes called bug trackers) are commonly used to track task assignment and progress. Most online project management software such as GitHub, SourceForge, and BitBucket come with an integrated issue tracker.

A screenshot from the Jira Issue tracker software (Jira is part of the BitBucket project management tool suite):


W8.3d :

Project Management → Project Planning → Work breakdown structure

Can explain work breakdown structures

A Work Breakdown Structure (WBS) depicts information about tasks and their details in terms of subtasks. When managing projects, it is useful to divide the total work into smaller, well-defined units. Relatively complex tasks can be further split into subtasks. In complex projects, a WBS can also include prerequisite tasks and effort estimates for each task.

The high level tasks for a single iteration of a small project could look like the following:

Task ID Task Estimated Effort Prerequisite Task
A Analysis 1 man day -
B Design 2 man day A
C Implementation 4.5 man day B
D Testing 1 man day C
E Planning for next version 1 man day D

The effort is traditionally measured in man hour/day/month i.e. work that can be done by one person in one hour/day/month. The Task ID is a label for easy reference to a task. Simple labeling is suitable for a small project, while a more informative labeling system can be adopted for bigger projects.

An example WBS for a game development project.

Task ID Task Estimated Effort Prerequisite Task
A High level design 1 man day -
B Detail design
  1. User Interface
  2. Game Logic
  3. Persistency Support
2 man day
  • 0.5 man day
  • 1 man day
  • 0.5 man day
A
C Implementation
  1. User Interface
  2. Game Logic
  3. Persistency Support
4.5 man day
  • 1.5 man day
  • 2 man day
  • 1 man day
  • B.1
  • B.2
  • B.3
D System Testing 1 man day C
E Planning for next version 1 man day D

All tasks should be well-defined. In particular, it should be clear as to when the task will be considered done.

Some examples of ill-defined tasks and their better-defined counterparts:

Bad Better
more coding implement component X
do research on UI testing find a suitable tool for testing the UI

Exercises



W8.3e :

Project Management → Project Planning → Gantt charts

Can explain Gantt charts

A Gantt chart is a 2-D bar-chart, drawn as time vs tasks (represented by horizontal bars).

A sample Gantt chart:

In a Gantt chart, a solid bar represents the main task, which is generally composed of a number of subtasks, shown as grey bars. The diamond shape indicates an important deadline/deliverable/milestone.


W8.3f :

Project Management → Project Planning → PERT charts

Can explain PERT charts

A PERT (Program Evaluation Review Technique) chart uses a graphical technique to show the order/sequence of tasks. It is based on the simple idea of drawing a directed graph in which:

  • Nodes or vertices capture the effort estimations of tasks, and
  • Arrows depict the precedence between tasks

An example PERT chart for a simple software project


md = man days

A PERT chart can help determine the following important information:

  • The order of tasks. In the example above, Final Testing cannot begin until all coding of individual subsystems have been completed.
  • Which tasks can be done concurrently. In the example above, the various subsystem designs can start independently once the High level design is completed.
  • The shortest possible completion time. In the example above, there is a path (indicated by the shaded boxes) from start to end that determines the shortest possible completion time.
  • The Critical Path. In the example above, the shortest possible path is also the critical path.

Critical path is the path in which any delay can directly affect the project duration. It is important to ensure tasks on the critical path are completed on time.


W8.3g

Project Management → Teamwork → Team structures

Can explain common team structures

Given below are three commonly used team structures in software development. Irrespective of the team structure, it is a good practice to assign roles and responsibilities to different team members so that someone is clearly in charge of each aspect of the project. In comparison, the ‘everybody is responsible for everything’ approach can result in more chaos and hence slower progress.

Egoless team

In this structure, every team member is equal in terms of responsibility and accountability. When any decision is required, consensus must be reached. This team structure is also known as a democratic team structure. This team structure usually finds a good solution to a relatively hard problem as all team members contribute ideas.

However, the democratic nature of the team structure bears a higher risk of falling apart due to the absence of an authority figure to manage the team and resolve conflicts.

Chief programmer team

Frederick Brooks proposed that software engineers learn from the medical surgical team in an operating room. In such a team, there is always a chief surgeon, assisted by experts in other areas. Similarly, in a chief programmer team structure, there is a single authoritative figure, the chief programmer. Major decisions, e.g. system architecture, are made solely by him/her and obeyed by all other team members. The chief programmer directs and coordinates the effort of other team members. When necessary, the chief will be assisted by domain specialists e.g. business specialists, database experts, network technology experts, etc. This allows individual group members to concentrate solely on the areas in which they have sound knowledge and expertise.

The success of such a team structure relies heavily on the chief programmer. Not only must he/she be a superb technical hand, he/she also needs good managerial skills. Under a suitably qualified leader, such a team structure is known to produce successful work.

Strict hierarchy team

At the opposite extreme of an egoless team, a strict hierarchy team has a strictly defined organization among the team members, reminiscent of the military or a bureaucratic government. Each team member only works on his/her assigned tasks and reports to a single “boss”.

In a large, resource-intensive, complex project, this could be a good team structure to reduce communication overhead.

Exercises




Guidance for the item(s) below:

Testing is the first thing that comes to mind when you hear 'Quality Assurance' but there are other QA techniques that can complement testing. Let's first take a step back and take a look at QA in general, followed by a look at some other QA techniques.

[W8.4] Other QA Techniques

W8.4a :

Quality Assurance → Quality Assurance → Introduction → What

Can explain software quality assurance

Software Quality Assurance (QA) is the process of ensuring that the software being built has the required levels of quality.

While testing is the most common activity used in QA, there are other complementary techniques such as static analysis, code reviews, and formal verification.


W8.4b :

Quality Assurance → Quality Assurance → Introduction → Validation versus verification

Can explain validation and verification

Quality Assurance = Validation + Verification

QA involves checking two aspects:

  1. Validation: are you building the right system i.e., are the requirements correct?
  2. Verification: are you building the system right i.e., are the requirements implemented correctly?

Whether something belongs under validation or verification is not that important. What is more important is that both are done, instead of limiting to only verification (i.e., remember that the requirements can be wrong too).

Exercises



W8.4c :

Quality Assurance → Quality Assurance → Code Reviews → What

Can explain code reviews

Code review is the systematic examination of code with the intention of finding where the code can be improved.

Reviews can be done in various forms. Some examples below:

  • Pull Request reviews

    • Project Management Platforms such as GitHub and BitBucket allow the new code to be proposed as Pull Requests and provide the ability for others to review the code in the PR.
  • In pair programming

    • As pair programming involves two programmers working on the same code at the same time, there is an implicit review of the code by the other member of the pair.
  • Formal inspections

    • Inspections involve a group of people systematically examining project artifacts to discover defects. Members of the inspection team play various roles during the process, such as:

      • the author - the creator of the artifact
      • the moderator - the planner and executor of the inspection meeting
      • the secretary - the recorder of the findings of the inspection
      • the inspector/reviewer - the one who inspects/reviews the artifact

Advantages of code review over testing:

  • It can detect functionality defects as well as other problems such as coding standard violations.
  • It can verify non-code artifacts and incomplete code.
  • It does not require test drivers or stubs.

Disadvantages:

  • It is a manual process and therefore, error prone.

Resources



W8.4d :

Quality Assurance → Quality Assurance → Static Analysis → What

Can explain static analysis

Static analysis: Static analysis is the analysis of code without actually executing the code.

Static analysis of code can find useful information such as unused variables, unhandled exceptions, style errors, and statistics. Most modern IDEs come with some inbuilt static analysis capabilities. For example, an IDE can highlight unused variables as you type the code into the editor.

The term static in static analysis refers to the fact that the code is analyzed without executing the code. In contrast, dynamic analysis requires the code to be executed to gather additional information about the code e.g., performance characteristics.

Higher-end static analysis tools (static analyzers) can perform more complex analysis such as locating potential bugs, memory leaks, inefficient code structures, etc.

Some example static analyzers for Java: CheckStyle, PMD, FindBugs

Linters are a subset of static analyzers that specifically aim to locate areas where the code can be made 'cleaner'.


W8.4e :

Quality Assurance → Quality Assurance → Formal Verification → What

Can explain formal verification

Formal verification uses mathematical techniques to prove the correctness of a program.

An introduction to Formal Methods


Advantages:

  • Formal verification can be used to prove the absence of errors. In contrast, testing can only prove the presence of errors, not their absence.

Disadvantages:

  • It only proves the compliance with the specification, but not the actual utility of the software.
  • It requires highly specialized notations and knowledge which makes it an expensive technique to administer. Therefore, formal verifications are more commonly used in safety-critical software such as flight control systems.

Exercises




Guidance for the item(s) below:

One of the primary goals of a software engineer is to avoid bugs. You certainly don't want to be the person responsible for causing a major bug that caused heavy damages to some party. That's why we need to focus heavily on testing -- one of the main defences against bugs.

The next few sections cover some intermediate level testing topics that you are very likely to encounter in software engineering.

[W8.5] Testing: Intermediate Concepts : OPTIONAL

W8.5a :

Quality Assurance → Testing → Introduction → Testability

Can explain testability

Testability is an indication of how easy it is to test an SUT. As testability depends a lot on the design and implementation, you should try to increase the testability when you design and implement software. The higher the testability, the easier it is to achieve better quality software.


W8.5b :

C++ to Java → JUnit → JUnit: Intermediate

Can use intermediate features of JUnit

Skim through the JUnit 5 User Guide to see what advanced techniques are available. If applicable, feel free to adopt them.


W8.5c : OPTIONAL

Quality Assurance → Testing → Test-Driven Development → What


Follow up notes for the item(s) above:

You are welcome to, but not required to, follow the TDD approach in your project.